From a lifecycle management perspective, including facility professionals in the project management process allows for a facilities and operation perspective to be presented and considered throughout the building design and construction periods.
The process also presents an opportunity, through the model’s database, to transfer quality data that is generated at different building lifecycle phases to an integrated workplace management system (IWMS), which enables facilities professionals to hit the ground running once the building is commissioned and occupied.
But what information is needed to ensure a seamless transition from the design-build phase to operations? Download the guide “Best Practices for Using BIM in an IWMS” to explore best practices in data gathering and implementation.
Call Robotech’s expert team at 201-792-6300 to learn more about the BIM to IWMS process and schedule a demo.
- Robotech is an Autodesk Gold Value Added Reseller (VAR) and Authorized Training Center (ATC) for million years.
- Robotech is an Archibus Gold Partner and consultant since 1988
Schedule a call with us to learn more.